Frequently asked questions
From addition plans to building work
Follow the decisions on both sides of the project: preparing the scope and coordinating construction as it progresses.
Before work starts
Is an addition the best way to gain space?
Compare an extension with reorganizing the existing rooms. Consider outdoor space, access and how much of the current house each option will disturb.
How should a new addition connect to the existing home?
Look at circulation, floor levels and the transition between old and new construction. Coordinate weather protection and services as part of the connection.
What should be checked before committing to an extension?
Review property boundaries, site conditions and applicable approvals. Confirm that the proposed size and location can work before developing detailed drawings.
How can I compare contractors for phased work?
Ask how each would sequence the work and protect occupied areas. Compare their proposed exclusions, access plan and process for documenting changes.
What should happen before excavation begins?
Confirm access, service locations and how adjoining areas will be protected. Make sure the people working on site have the same drawings and scope.
Once work begins
When does the addition become enclosed?
The timing depends on the structure, openings and weather protection sequence. Ask what must be complete before interior work can proceed in protected conditions.
How should deliveries and site access be coordinated?
Agree where deliveries can arrive and where materials can be stored. Keep emergency and household access clear and account for weather and shared driveways.
What can change when new construction meets an older wall?
Opening the connection may reveal conditions that drawings could not confirm. Document what is exposed and review the proposed detail before covering the junction.
When should I expect interruptions to services?
Identify stages that may require temporary water, power or heating interruptions. Agree in advance how the contractor will communicate the duration and any changes.
How do I know a phase is ready to close out?
Check that the agreed work is complete and any required reviews have taken place. Record open items and confirm which decisions carry over to the next stage.
Additional questions
How do I decide what to retain and what to replace?
List the elements that work well, then compare repair and replacement against condition, access and the intended use. Check uncertain assemblies before assuming that surface appearance tells the whole story.
Can new cladding meet an existing wall without a visible break?
The transition depends on the existing assembly, drainage and flashing. Resolve the weather protection first, then decide how the visible trim or joint should read.
What belongs in an existing-conditions record?
Photograph the work area and adjacent finishes, note visible damage and mark accessible services. Keep confirmed observations separate from conditions that still need investigation.